# Distributed microgrid solutions



Distributed Microgrid Solutions · Multi-Node Autonomy and Coordination
  Distributed Microgrids: Organizing Dispersed PV, Storage and Loads into One Dispatchable Whole

  The biggest difference between a distributed microgrid and a single-point microgrid is **more nodes, fragmented ownership and a longer dispatch chain**. A single industrial park may have a dozen distributed PV-plus-storage units owned by different parties, each with a different interconnection capacity, and when voltage fluctuates or one unit fails, someone has to coordinate the whole system. VGID POWER's distributed solution turns each node into a micro source that can run independently, with a station-level EMS orchestrating them as a whole: **fault isolation, layered power, local consumption, off-grid self-healing**.

  **99.3%**DC-coupled charging efficiency

  **0ms**All-in-one active transfer

  **99.26%**PV MPPT peak efficiency

  **3 units**Parallel capability per model

  How Distributed Microgrids Differ from Single-Point Microgrids

  A single-point microgrid is usually built around one large-capacity storage unit, with a limited supply radius; a distributed microgrid organizes multiple dispersed resources into a mesh structure that can support one another. Understanding this difference is the prerequisite for equipment selection and dispatch design.

      Single point

      Built around one large-capacity unit

      One equipment room, one PCS, one battery bank; the supply radius is limited by cable length and voltage drop. Suitable for a single plant or a single park, but once that unit is taken offline for maintenance, the whole system stops.

      A fault affects the entire system; capacity expansion requires a shutdown and retrofit.

      Distributed

      Multiple nodes supporting one another

      Each node is a micro source that can run independently, coordinated through the station-level EMS. When one node fails, the others continue supplying power and carry its load; the supply radius is determined by the network topology rather than by a single unit.

      Faults are isolated within the node; capacity expansion proceeds incrementally by paralleling units or adding nodes.

      Ownership

      Multiple owners, multiple contracts

      The park's PV may belong to Company A, the storage to Company B, and the charging piles to the property manager. A distributed microgrid must account for metering, settlement and control authority separation at the design stage, rather than patching them in after commissioning.

      A common approach: energy and money are settled per contract, control commands are issued uniformly by the EMS, and physical isolation is achieved through switches and protection.

  System Layers: From Nodes to Station-Level Dispatch

  The dispatch logic of a distributed microgrid must be layered; otherwise you get the confusion of station level and node level competing for power. The four layers below are the recommended division.

      Layer 4

        Station-level dispatch layer

        Determines how much power the site exchanges with the grid and how it is allocated among nodes. Constraints come from the interconnection capacity and the power purchase agreement. The station-level EMS is the only layer authorized to issue power commands; node level must not change the interconnection point power flow on its own.

      Layer 3

        Node control layer

        Within each node, determines how PV, battery and local loads work together, responds to station-level commands and executes peak shaving, power limiting and voltage balancing locally. Transfer logic and protection logic are completed at this layer, so the transfer response time is essentially determined by the detection and switching action of the equipment inside the node.

      Layer 2

        Equipment layer

        The control cycles of the PCS, DC controller, MPPT, battery and STS are typically in the millisecond to hundred-millisecond range. The job of this layer is to translate the minute-level commands from above into real-time power and current curves, and to report operating status and alarms faithfully.

      Layer 1

        Measurement and protection layer

        Meters, sampling and protection relays form the factual basis. The data at this layer determines the quality of dispatch decisions and the speed of fault location. In a multi-node system, it is recommended that each node have its own power quality recorder rather than sharing one across the whole site.

  VGID POWER Distributed Microgrid Products

  Select by node scale. PV input goes through MPPT or a DC controller, storage is connected via an all-in-one unit or DC module, switching between nodes is handled by the STS, and when capacity is insufficient, multiple units are paralleled.

    [SP375/500HAG2 Series PV-Storage All-in-One Rated power (grid-tied) 375/500kVA PV input 120kW × 3/4 Charging efficiency >99.3% Active transfer 0ms Protection rating IP54 / IP20 View full technical specifications →](/zh/product/sp375-500hag2)
    [SP250HAG2T-2 PV-Storage All-in-One Rated power (grid-tied) 250kVA Max output (off-grid) 275kW Max battery current 200A × 2 PV power 60kW × 2 Protection rating IP54 / IP20 View full technical specifications →](/zh/product/sp250hag2t-2)
    [SP210HCDC DC Controller Rated power 210kW Input voltage range 600-1000V Max input current 220A Peak efficiency 99.2% Parallel operation 6 units View full technical specifications →](/zh/product/sp210hcdc)
    [SP200/150HAPV PV MPPT Controller Rated power 200/150kW MPPT voltage range 200-900V Peak efficiency 99.26% Protection rating IP65 Installation Wall View full technical specifications →](/zh/product/sp200-150hapv)
    [STS200/400/600 Static Transfer Module Rated capacity 200/400/600kW Max AC current 330/660/1000A Transfer time 99.3% Parallel operation Supported View full technical specifications →](/zh/product/sp120-60hcpv-sp105hcdc)

  The table above shows typical configurations. Actual selection requires the site single-line diagram, load curves and measured data at the interconnection point; VGID POWER can produce a complete selection report based on these.

  Four Key Autonomous Capabilities

  These capabilities are not add-on features; they are what distinguishes a distributed microgrid from "a bunch of networked equipment." To judge whether a solution truly has distributed capability, check whether these four hold up independently.

      01

        Fault isolation

        When a single node fails, that node's protection device trips to isolate it, and the station-level EMS redistributes power among the remaining nodes so supply is not interrupted. This requires each node's protection settings to be coordinated independently; they cannot share a single set.

      02

        Layered power

        Critical loads are supported locally by storage first, secondary loads are shed during peak hours, and PV is fully self-consumed first, with only the surplus exported. This order must be defined explicitly; an implicit default will shed the wrong loads at the critical moment.

      03

        Local consumption

        DC coupling lets PV and batteries exchange directly on the DC side, reducing one power conversion stage; station-level dispatch lets each node's surplus energy first supply nodes on the same network segment that are short on power, rather than sending it all back to the grid. The returns of a multi-node system come mainly from this.

      04

        Off-grid self-healing

        After a grid outage, the station-level EMS drives each node's transfer device to switch to off-grid operation upon detecting the loss of power, storage establishes the voltage and frequency reference, and loads are then restored in a preset priority order. The restoration sequence depends directly on whether each node has off-grid output capability, which must be confirmed at the design stage.

  Dispatch, Metering and Communication

  Eighty percent of the O&M experience in a multi-node system depends on how well this layer is done. It does not change the hardware selection, but it determines whether on-site staff face clear data or a pile of alarms every day.

      Scope of responsibility of the station-level EMS

      The station-level EMS handles interconnection point power flow control, power allocation among nodes, execution of peak-shaving strategies and generation of external settlement data. Equipment-level MPPT tracking and current loop control belong to the node layer; the station level should not and need not duplicate them. If this boundary is not drawn clearly, the system will be unstable because two sets of logic compete for control.

      Metering and settlement

      In multi-owner scenarios, it is recommended to meter independently at each node's interconnection point, with the station level only aggregating rather than calculating on behalf of others. This way, even if the parties' contract terms differ, settlement data can still be traced back to a specific node.

      Communication architecture

      Nodes and the station level communicate via RS485 or Ethernet, reporting upward level by level; the station level connects externally to the monitoring platform via 4G or wired links. VGID POWER equipment generally supports RS485/CAN and 4G, so on-site networking is not a bottleneck. Note that communication only carries monitoring and strategy delivery; **it cannot serve as a protection channel**—protection must be performed independently by hardware protection devices.

      Authority management for off-grid and grid-tied modes

      Off-grid transfer affects personnel safety, so authority must be tightly controlled. Transfer commands should only accept hard contacts from the station-level EMS or authenticated communications, and a local panel should be provided as an emergency bypass. Avoid letting commands from any source trigger a transfer.

  Typical Application Scenarios

      Multi-node microgrid in an industrial park

      A park has PV and storage owned by multiple parties and needs to prioritize self-consumption under a limited interconnection capacity. The approach is to divide nodes by transformer zone, let each node run independently, and have the station-level EMS handle surplus power exchange. A common practice in parks is to split rooftop PV, storage and charging piles into three to five nodes rather than routing everything into one equipment room.

      Rooftop PV plus storage for commercial and industrial users

      The rooftop PV output curve and the load curve do not match in time; output peaks at noon while some daytime periods also have high consumption. Adding storage shifts the midday surplus to the evening peak. The node is usually located below the roof, with capacity configured according to the number of inverters, and communication via RS485 to the park aggregation point.

      Charging stations coordinated with PV and storage

      Charging loads are concentrated in specific periods, and connecting them directly tends to raise the transformer peak. Connecting the charging piles behind the PV-storage node lets the station-level EMS allocate PV and battery output according to charging demand, prioritizing charging during valley hours to reduce demand charges while preventing charging surges from affecting other loads.

      Plant microgrid with multiple complementary energy sources

      PV, storage, diesel generators and adjustable loads (such as refrigeration, air compression and hydrogen production pre-treatment) coexist. The key in such scenarios is not stacking equipment but determining who supplies power under what conditions. The diesel generator starts only when battery SOC falls below a threshold or the load exceeds the PCS capability, and stays on standby the rest of the time.

      Data center backup power

      For scenarios sensitive to transfer time, the node must have genuine off-grid output capability, not a combination of a grid-tied unit plus an STS. Design should size the battery according to the actual IT load in use rather than installed capacity, and confirm the scope of supply to be maintained during upstream grid maintenance.

      Rural distribution area PV-storage pilot

      During the day, PV export raises the voltage at the end of the feeder; in the evening, load drops and PV output drops in step, making voltage limit violations likely. Such pilots typically use small-capacity wall-mounted models distributed downstream of the distribution transformer, relying on node-level voltage control to limit export rather than on large equipment in an equipment room.

      Overall zero-carbon park solution

      When a park applies for zero-carbon or green power certification, the metering basis must match the certification rules. The difficulty in such projects is usually not the equipment but the data: the self-consumption ratio in green power trading, the ownership of surplus power fed to the grid, and green certificate coverage must be determined at the node division stage, otherwise they cannot be traced later.

      Distributed expansion of existing equipment rooms

      An existing equipment room and interconnection capacity are in place, and the goal is to add PV and storage without applying for new capacity. The approach is to distribute the new equipment to locations near load centers, using the existing interconnection capacity as a unified constraint. This requires the existing equipment's EMS to support receiving external power commands; otherwise the new nodes can only operate independently.

  Design and Implementation Points

      ① Divide nodes first, then select equipment

      Node division is based on transformer zones, ownership boundaries and interconnection point locations, not equipment models. First settle "who is where, connected to what, and whose account it goes on," and only then does equipment selection have constraints. Doing it the other way around often results in buying the right equipment but being unable to connect it to the grid.

      ② Calculate each node's capacity independently

      Sufficient total station capacity does not mean every node has enough. A node's capacity depends on the PV output, load curve and available interconnection capacity within that node, and the three must match. A common mistake is sizing the battery to the whole site's peak load, leaving batteries at remote nodes idle for long periods.

      ③ Define the off-grid supply scope clearly

      You must list item by item the equipment that must remain powered during an outage and confirm each item's starting current. The storage must handle the starting surges of these loads on its own; total rated power cannot be used as a substitute. VGID POWER models generally support 1.1× continuous / 1.25× short-time overload (SP60HCG2 up to 150%), but high-power motors still need separate calculation.

      ④ Set protection settings node by node

      Fault current levels differ across nodes in a multi-node system, so applying one set of settings site-wide will inevitably cause problems. Overcurrent, instantaneous and ground protection settings and time delays must be calculated separately according to each node's equivalent impedance and coordinated with upstream and downstream grading. Grid-tied and off-grid protection criteria differ and must be set separately.

      ⑤ Keep only one reference source when paralleling multiple units

      When multiple grid-forming units are paralleled, one must be designated as the master to establish the voltage and frequency reference, with the others following as slaves. Two units establishing a reference simultaneously will cause frequency fighting and circulating currents. VGID POWER SP250HAG2T and SP375/500HAG2 both support paralleling of 3 units; configuration must specify master assignment and transfer logic.

      ⑥ Choose the right environmental and protection ratings

      Outdoor or semi-outdoor: wall-mounted models use IP65 (SP135HAPSS), all-in-one cabinets use IP54 (SP250HAG2T, SP375/500HAG2). In high-temperature areas, note derating—products operating above 45℃ derate output according to a curve, and high altitude (above 2000m) also requires derating. If these two are overlooked, problems are most likely to appear during summer peak demand.

  Project Photos

      PV-storage all-in-one units installed in a plant

      Distributed nodes and pad-mounted transformer

      Rooftop PV array

      Storage cabinets and fire protection facilities

      Station-level monitoring room

      Interconnection point switchgear and protection

      Park charging facilities

      Multi-node communication cabling

  Frequently Asked Questions

      How do I choose between a distributed microgrid and a single-point microgrid?
      Look at two conditions: **whether the nodes are dispersed and under different ownership**, and **whether the interconnection capacity is tight**. If the resources are concentrated near one equipment room and ownership is single, a single-point solution is simpler and more economical; if the resources are dispersed across multiple locations with different owners, or the interconnection capacity is already near its limit, the case for a distributed solution emerges. There are also hybrid forms—a single main point with local nodes.

      How much PV and storage can one node carry?
      It depends on the combination of equipment within the node. VGID POWER's product line covers 30kVA to 750kVA, from a single wall-mounted hybrid inverter with one battery bank up to a 375/500kVA all-in-one unit with multiple PV inputs. How much can actually be connected is mainly limited by three things: **the number of PV input channels and the power per channel are limited by the inverter**, **battery current is limited jointly by the PCS and the cable cross-section**, and **the interconnection capacity**. The first two depend on the model specifications; the third requires on-site measurement.

      What happens if communication between nodes is lost?
      Each node should be able to maintain operation independently; this is a basic requirement of a distributed solution. When communication is lost, the node continues operating according to the last power command received, with the local controller as a fallback, rather than tripping and shutting down. Note that **the consequences of losing communication in off-grid mode differ from grid-tied mode**: when grid-tied, a node can obtain a frequency reference from the grid, whereas off-grid it relies entirely on itself, so the local control logic of an off-grid system must be able to perform voltage and frequency regulation independently.

      Is a distributed solution a higher investment than a single-point one?
      Equipment costs are usually higher—more points and smaller capacities mean more units and more communication and protection configuration. But total cost of ownership may be lower: distributed local supply reduces cable length and line losses, a smaller fault impact area means less loss from outages, and expansion proceeds on demand rather than all at once. Whether it is economical depends on the site's expansion frequency and the magnitude of outage losses; it is advisable to compare total cost of ownership over a 10-year period rather than looking only at the initial quote.

      Can a single-point system be converted to a distributed one later?
      Yes, but the cost is usually higher than designing for distributed operation from the start. Conversion means adding interconnection points and protection configuration, redoing communication and metering, and possibly replacing existing EMS equipment that lacks distributed interfaces. The real problem is this: if node-level metering and communication were not implemented initially, the historical data for each node cannot be reconstructed during a later retrofit, making multi-owner settlement difficult. So the key is not whether it can be converted, but whether interfaces and metering points were reserved at the outset.

      How long does a project take from contract signing to commissioning?
      The main time is not in equipment supply but in design and approvals. A typical schedule: site survey and data collection 2 to 3 weeks, solution design and selection confirmation 2 to 3 weeks, equipment delivery 4 to 8 weeks (all-in-one units and wall-mounted units differ considerably), installation and commissioning 1 to 3 weeks, grid connection acceptance and filing 2 to 6 weeks, depending on the local power supply department's procedures. If storage grid connection testing or fire safety review is involved, additional time is required.

  Is your park suitable for a distributed microgrid?

  Provide the interconnection point locations, a list of connected distributed resources and load curves, and VGID POWER can complete node division and preliminary capacity calculations, and offer a comparison of distributed and single-point options.